Construction preparation usually carries out a client or a company designated by the client; progressing according to the delivered type project and under the supervision of the weighbridge supplier. 

  • Preparation of the base of the weighbridge
  • Preparation of access roads
  • Laying of drainage pipes
  • Placing protection pipes for cabling between weighing segments, traffic light poles and the weighing room
  • Placing and connection of the grounding strip
  • Preparation of the weighing room or installation of the base of the outdoor electric cabinet

? Dynamic crossing weighbridge

VM2
Prefabrikat-II
Built-in prefabricate into the weighing zone

Static weighbridge

Mostova+PC
priprava-na-betonaz-zakladove-desky-zapustene-mostove-vahy
Preparation for concreting the baseplate of static weighbridge

This website uses cookies

For the proper operation of the website only nevessary essential cookie files are activated. However, optional cookies must be enabled for full service delivery, ad personalization and traffic analysis. Use the following button to turn them on. Show details

Settings

Your privacy is important. You can choose from the cookie settings below. Show details